Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame

Product Details
Customization: Available
After-sales Service: Design, Manufacture, Delivery, Install Customized
Connection Form: Welded Connection
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

R&D Capabilities
The supplier has 28 R&D engineers, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
In-stock Capacity
The supplier has In-stock capacity
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (22)
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
  • Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Find Similar Products
  • Overview
  • Product Description
  • Certifications
Overview

Basic Info.

Model NO.
Multistorey86101
Feature
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install
Online Support
Weight
Light Weight
Intensity
High Intensity
Stiffness
The Overall Stiffness Is Good
Apply
Easy to Apply
Homogeneity
The Material Has Good Homogeneity
Toughness
Good Toughness
Industrialization
High Degree of Industrialization
Period
The Construction Period Is Short
Reliability
High Structural Reliability
Deformation
Strong Resistance to Deformation
Design
Customized
Manufacture
Customized
Delivery
Customized
Waterproof
Highly
Type
H-Section Steel
Transport Package
Strapping and Packing
Specification
2000m²
Trademark
Shandong Qianfeng Chentai Steel Structure
Origin
China
HS Code
730890
Production Capacity
200, 000 Tons / Year

Packaging & Delivery

Package Size
1100.00cm * 200.00cm * 200.00cm
Package Gross Weight
22000.000kg

Product Description

 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Product Description

Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Strong bearing capacity: Steel has excellent mechanical properties, and its strength is much higher than that of traditional building materials such as brick, stone, concrete, etc. This enables steel structure buildings to withstand greater loads, such as high-rise buildings, long-span bridges, large industrial plants and other buildings with high bearing capacity requirements, and steel structures can well meet the demand. For example, when building a large stadium, the steel structure can easily achieve a large-span spatial layout to provide an open and unobstructed view for the audience.

Light weight: Despite the high strength of steel, the dead weight of steel structure buildings is relatively light. This is because the steel structure adopts a reasonable cross-sectional shape and arrangement, which can minimize the amount of steel under the premise of ensuring the strength and stability of the structure. Compared with traditional concrete buildings, steel buildings can generally reduce their weight by 30% to 50%. For example, in the construction of super high-rise buildings, the advantages of light weight of steel structure are particularly obvious, which can greatly reduce the load of foundation engineering and reduce the cost and difficulty of infrastructure construction.




Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame



 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Component factory prefabrication: Most of the components of steel structure buildings are prefabricated in factories. Factory production has the characteristics of high precision and high efficiency, and can be produced in strict accordance with the design requirements and standards to ensure the stable quality of components. At the same time, the production equipment and technology in the factory are relatively advanced, which can achieve large-scale and mass production and greatly improve production efficiency.
 
On-site rapid assembly: After the prefabricated steel structural components are transported to the construction site, they are quickly assembled using mechanized construction methods. The connection methods of steel structure mainly include welding, bolt connection, etc., which are relatively simple to operate and can complete the connection and fixing of components in a relatively short time. Compared with the traditional concrete structure building, the on-site construction of the steel structure building has less wet work, and there is no need to carry out a large number of concrete pouring, maintenance and other work, which greatly shortens the construction period
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Large-span space: The steel structure has good mechanical properties and structural stability, and can achieve a large span. In architectural design, the long-span spatial structure can provide an open, column-free interior space for the building to meet the needs of different building functions. For example, in large public buildings such as exhibition halls, gymnasiums, and terminals, the application of steel structure large-span space is very extensive. Taking the exhibition hall as an example, the large-span steel structure space can be easily used for exhibition layout, display various large-scale exhibits, and also provide a spacious and comfortable visiting environment for the audience.
 
 
All construction surveyors must be licensed, if any replacement must be agreed by the technical person in charge of the site is responsible for the transfer to ensure the normal construction of the project.

Familiarize with the drawings (general plan, axial plan, foundation plan, deepen the detailed drawings), to understand the design intent, to fully grasp the axis, dimensions, elevation and site conditions, the relevant dimensions of the design of the paper and the measurement of the setup of the data should be carefully calibrated.

Measurement control point handover and rechecking.Before the steel structure construction unit enters the construction site, it should retest the plane control network and elevation control points of the building construction (coordinates and elevation control points are provided by the owner or the general contractor). According to the requirements of the construction progress plan, the measurement program, the measurement method, the calculation of the measurement data and the drawing of the measurement sketches.

1) Review the drawings carefully when you get them and check whether the location of anchor bolts crosses the reinforcement in the foundation column and whether there are any other construction contradictions.
2)After acceptance of foundation reinforcement binding, install the anchor bolts.
3) Check the hole position and hole diameter of the positioning steel plate one by one after the positioning steel plate is delivered to the site, and do not meet the requirements.
4) Reasonable arrangement of the installation sequence, has entered the site of the anchor bolts to do a good job of protection and storage.
5) In the construction should pay attention to the tying of bearing steel (or foundation steel) after the completion of the installation of anchor bolts.
6) The installation of anchor bolts should be carried out after the completion of the installation of anchor bolts.
7) The installation of anchor bolts should be carried out after the completion of the installation of the anchor bolts.

The elevation point of Shi 0.000 is provided by the owner or the general contractor to provide the elevation control point set at the site, and the elevation control point of the building construction is retested before the construction of the steel structure.

Bolts require uniformity of threads, thread length, leakage size and verticality to meet the design requirements and specification requirements.After the bolts enter the construction site by the constructor for acceptance, check the bolt factory certificate, test report, specification size, quantity, wire buckle length is in line with the design requirements, acceptance of qualified according to the specifications of the yard neatly, and do a good job of marking.

Steel girder assembling is used for larger span truss, light steel structure, section 1, H, mouth type mostly, the connection method has three forms of high-strength bolts, bolt welding combination and welding.Portal steel frame, variable cross-section inclined beam or multi-section, solid web welded I-beam cross-section or light H-section, portal steel frame inclined beam is divided into several units according to the transportation conditions, and the units can be connected with high-strength bolts through the end plates.

For the sake of structural stability, easy calibration and accurate installation, for multi-storey structural floors, the top beams should be fixed first, then the lower beams, and finally the intermediate beams.When the installation of columns and beams in a frame is completed, measure and correct this in time.


 
1.Length H beam 4000-15000mm
2.Height 200-1200mm
3.color According to customers
4.Base Cement and steel fouddation bolts
5.Main frame H beam
6.Bolt Plain bolt ang high-strenth bolt
7.Roof&wall  Sandwich panel or color plate
8.Door Sliding or rolling door
Customized design is welcomed.
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.
 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame





Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Shandong Chentai Heavy Steel Construction Group is a comprehensive industrial group that integrates steel structure research and development, design, manufacturing, production, and installation. Since its establishment in 2004, it coversan area of approximately 300000 square meters and produces 200000 tons of steel structures annually. We have over 500 well-trained employees, more than 100 professional design teams, after-sales service teams, and many advanced equipment.

The company has 30 steel structure production lines, specializing in the design, manufacturing, and installation of industrial and civil buildings such as steel structure factories, warehouses, high-rise steel structure buildings, office buildings, exhibition,halls, sports halls, parking garages, prefabricated houses, and agricultural projects. We are committed to providing customers with innovative solutions that not only meet their expectations, but also exceed them.

 
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame

Construction footprints throughout Shandong, Henan, Hebei, Jiangsu and other places; in Shandong Province in all areas have project construction experience.The company has complete processing equipment, automatic submerged arc welding machine, CO2 gas shielded welding machine, large-scale shot blasting machine, plasma cutting machine and descaling, leveling and calibrating equipment, realizing a one-stop manufacturing and production of discharging, assembling, welding, straightening, shot blasting, painting and inspection, and the construction works are highly evaluated by the construction side and the quality supervision department.

We also have a high-level and experienced steel structure design and development team, and our professional design engineers are fully equipped to undertake the deepening of drawings for various industrial plants and civil buildings.
The main products of our company are hidden roof panel, rock wool purification board, truss floor bearing plate, steel structure, rock wool composite board, rock wool sandwich composite board, composite board, polyurethane sandwich composite board, polyurethane rock wool board, purification board and so on.
CHENTai people adhere to the "quality-oriented, dedicated service; excellence, mutual benefit and win-win" as the business philosophy, we firmly believe that: CHENTai will be more brilliant!
Steel structures are widely used in large-scale factories and arenas due to their light weight and simple construction.The requirements of steel structure are summarized for reference.


Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame
Certifications


Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel FrameWhat are the matters to be paid attention to in the fabrication, transportation, installation, fire protection and rust prevention of steel structure components?

(1) Fabrication: The fabrication of steel structure includes many aspects such as release, numbering, cutting, calibration and so on.The anti-slip coefficient of the friction surface after high-strength bolt treatment should meet the design requirements.
Rust removal and painting are carried out after qualified production quality inspection.General installation of welds left 30 ~ 50mm temporary unpainted.
(2) Welding: welders must be qualified by the examination and obtain a certificate of competency, and must be qualified in its examination project and its recognized scope of welding.Welding after welding shall be in the process of welding and parts of the welder to play on the welder's seal.
Welding materials and base materials should be matched, full weld through the first and second level of welds should be used ultrasonic flaws for internal defects, ultrasonic flaws can not make a judgment on the defects, the use of radiation flaw detection.
Construction unit for the first time the steel, welding materials, welding methods, etc., welding process assessment.
(3) Transportation: When transporting steel components, choose the vehicle according to the length and weight of the steel components.The pivot point of the steel member on the vehicle, the length of both ends and the tying method should ensure that the member will not be deformed and the coating will not be damaged.
(4) Installation: The steel structure shall be installed in accordance with the installation procedures to ensure the stability of the structure and not lead to permanent deformation.When installing columns, the positioning axis of each section of column shall be led directly from the ground control axis.After installing the columns, beams, roof frames and other major components of the steel structure in place, they shall be calibrated and fixed immediately.
The friction surface of the members treated by the factory shall be reviewed and tested for anti-slip coefficient before installation and qualified before installation.
(5) Fire prevention and rust prevention:
1) The fireproof performance of steel structure is poor.When the temperature reaches 550ºC, the yield strength of steel drops to about 0.7 of the yield strength at normal temperature, and the structure reaches its strength design value and may be damaged.
Design should be based on the provisions of the relevant defense, so that the building structure can meet the requirements of the corresponding fire.In the time required by the fire prevention standard, the temperature of the steel structure should not exceed the critical temperature to ensure the normal bearing capacity of the structure.
2) The exposed steel structure may be subject to serious corrosion, most commonly rust, by the atmosphere, especially the polluted atmosphere.This necessitates anti-corrosion treatment of the surfaces of the members to ensure the normal use of the steel structure.The method of anti-corrosion treatment is determined by the surface conditions of the members and the requirements of service life.
Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame

Multi-Story Prefabricated Building Materials Real Estate Construction Steel Structure Building Steel Frame1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to Qingdao port. And we have total 7 workshops from steel structure to wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use materials from big material manufacture companies. We also can design it according to your requirement. But no matter what kind of quotation mode, offering the reasonable
price is our business objective.

4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla, etc. Or we will provide the engineers to help according to your requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian Quanzhou Airport, then we will pick you up at the airport, hotel booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now