Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

Product Details
Customization: Available
After-sales Service: Troubleshooting and Repair
Layers: Double-Layer
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

R&D Capabilities
The supplier has 28 R&D engineers, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
In-stock Capacity
The supplier has In-stock capacity
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (22)
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
  • Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Find Similar Products
  • Overview
  • Product Description
  • Factory show
  • product features
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
Factory 96904
Usage
Dust-Proof Workshop, Electrostatic Workshop, Food And Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile And Electronic Processing, Warehouse
Weight
Light Weight
Intensity
High Intensity
Stiffness
The Overall Stiffness Is Good
Apply
Easy to Apply
Homogeneity
The Material Has Good Homogeneity
Toughness
Good Toughness
Industrialization
High Degree of Industrialization
Period
The Construction Period Is Short
Reliability
High Structural Reliability
Deformation
Strong Resistance to Deformation
Transport Package
Strapping and Packing
Specification
2000m²
Trademark
Shandong Qianfeng Chentai Steel Structure
Origin
China
HS Code
730890
Production Capacity
200, 000 Tons / Year

Packaging & Delivery

Package Size
1100.00cm * 200.00cm * 200.00cm
Package Gross Weight
22000.000kg

Product Description

Product Description

Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
 

Product name
 

Steel structure workshop
 
Length H beam 4000-15000mm
Height 200-1200mm
color According to customers
Base Cement and steel fouddation bolts
Main frame H beam
Bolt Plain bolt ang high-strenth bolt
Roof&wall  Sandwich panel or color plate
Door Sliding or rolling door
Customized design is welcomed.
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.
  
 
                        H-beam                                                             I-beam                                                   Channel Steel
 
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
 
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

                       Angle steel                                                   Square tube                                                   Round tube
  

Fast construction speed
Steel structure components can be prefabricated in the factory and then transported to the construction site for assembly. Compared with traditional concrete structures, the time for on-site construction is greatly reduced. For example, a medium-sized steel structure factory building may only take a few months to install on site if the prefabricated components are well prepared, while a concrete structure factory building may take half a year or even longer. Because the concrete structure needs to be poured on site, it is necessary to wait for the concrete to reach sufficient strength before the next step of construction can be carried out, while the installation of the steel structure is relatively simple and quick.



High space utilization rate
Steel structure workshops use steel columns and steel beams to form a space frame structure, and the interior can be designed with large spans, no columns or few columns. It is very beneficial for some companies that need large-scale production equipment or large-area storage. For example, in large-scale machinery manufacturing workshops, large CNC machine tools, cranes and other equipment need to be placed. Steel structure workshops can provide spacious space, which is convenient for the layout and operation of equipment, and the storage and transportation of goods are more convenient, without too many columns hindering the use of space.

 
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Good economy
From the perspective of material cost, although the price of steel itself fluctuates to a certain extent, steel structure workshops can save costs in infrastructure construction due to their light weight. In contrast, the foundation of a concrete structure workshop needs to bear a greater weight, and the foundation cost is relatively high. For example, the foundation of a steel structure workshop may only require a simple independent foundation or strip foundation, while a concrete structure workshop may require a more complex raft foundation, etc.
In terms of later maintenance costs, if the steel structure workshop is properly treated with anti-corrosion and fire prevention, the maintenance cost is relatively low. In addition, the components of the steel structure workshop can be disassembled and reused. When the enterprise needs to relocate or renovate the workshop, the steel structure components can be reinstalled at the new site, reducing material waste and reducing costs.
 
Good environmental performance
The main material of steel structure workshops is steel, which is a recyclable material. After the workshop is demolished or renovated, the steel can be recycled and processed, reducing the generation of construction waste. For example, when the service life of a steel structure workshop ends, its steel components can be recycled and remelted into new steel for use in other buildings or industrial products.
During the construction process, steel structure workshops generate relatively less dust, noise, and waste pollution than concrete structure workshops. Concrete construction will generate a lot of dust, and the process of mixing concrete is noisy. The prefabricated components of steel structures are processed in the factory, and the on-site installation is mainly bolt connection and other operations, so the noise and dust pollution are relatively small.
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price


 
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price


Our advantages:
1. We have a professional team of designers to provide design drawings that satisfy you.
2. The factory processes high-quality steel structure materials and packages them for delivery.
3. steel structure products have the advantages of light weight, high strength, good seismic performance, and short construction period.
4.During construction, construction time and costs can be reduced due to the use of steel structures that can be assembled quickly, resulting in shorter delivery times for construction projects.


Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

Modern Design Prefabricated Steel Structure Factory Building, China Factory Price


 
Factory show

 

Modern Design Prefabricated Steel Structure Factory Building, China Factory Price
Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
 

 

Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Modern Design Prefabricated Steel Structure Factory Building, China Factory Price



Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.

Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.

Installation drawings: we will supply the detailed installation drawings and video to show how to install the products. Even send the engineers to site for installation help.

"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

product features

Modern Design Prefabricated Steel Structure Factory Building, China Factory PriceModern Design Prefabricated Steel Structure Factory Building, China Factory PriceModern Design Prefabricated Steel Structure Factory Building, China Factory Price

 

Packaging & Shipping

 

Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box


 
Certifications

Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

  
FAQ


Modern Design Prefabricated Steel Structure Factory Building, China Factory Price

♥♥ Hi dear friends, please note
Steel structure building is a product that can be designed according to the different needs of each pillar.
So, if you find that the following example pictures are not the same as your needs, or even very different.
Do not worry
No matter what kind of building you need,Bigger, smaller or multi-storey, just tell me the building data or drawings you need.
We will make accurate designs, quotations and renderings for you as soon as possible.
(Our group has more than 10 years of experience in steel structure)

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now