Product Description
Product name |
Steel structure workshiop |
Length |
H beam 4000-15000mm |
Height |
200-1200mm |
Galvanizing Thickness |
40 - 100 μm, etc. for Selection. |
Main frame |
H beam |
Base |
Cement and steel fouddation bolts |
Specification |
Custom |
Bolt |
Plain bolt ang high-strenth bolt |
Roof&wall |
Sandwich panel or color plate |
Door |
Sliding or rolling door |
Transport Package |
Seaworthy Package |
Trademark |
Qianfeng Chentai Steel Structure |
Finishing options |
Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. |
Usages |
1. Steel workshop, steel warehouse, steel structure plant |
2. Steel web frame structure |
3. Steel H-column and steel H-beam |
4. Portal frame products |
5. High rise building project |
6. Others steel structure buildings |
Customized design is welcomed. |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
Package Size |
100.00cm * 100.00cm * 100.00cm |
Package Gross Weight |
100.000kg |
The steel structure logistics park is a modern logistics hub built with the help of steel structure. In terms of structural composition, H-beam steel, square tube steel, etc. are selected to build the main load-bearing system to form a stable framework to withstand the huge pressure brought by warehouses and shelves. These steels have high strength and good toughness, which can ensure the long-term stable operation of the park in complex environments, such as strong winds, heavy snowfall and other extreme weather.
From the perspective of space utilization, the steel structure can realize the construction of large-span space without too much internal support, providing spacious, open and regular storage and operation space for the logistics park, which is convenient for the stacking and handling of large goods and the efficient operation of logistics equipment.
During the construction process, the components of the steel structure are transported to the site for assembly after the factory is prefabricated, which greatly shortens the construction period and can be put into use quickly, meeting the high requirements of the logistics industry for timeliness. At the same time, factory production can effectively control the quality, reduce the uncertainty of on-site construction, and reduce the cost of later maintenance.
In addition, the steel structure logistics park can flexibly adjust the internal layout, increase or decrease the functional area according to the changes and expansion of the logistics business, and realize the efficient use of space and sustainable development, which is an ideal architectural form to adapt to the rapid development of modern logistics.
Product Advantages:
Efficient use of space
The steel structure has excellent mechanical properties and can be built over a large span without the need for a large number of internal support structures. This makes the internal space of logistics warehousing extremely spacious, open and regular, which can effectively improve the utilization rate of storage space. Large goods can be easily stacked, and logistics equipment such as forklifts and stackers can be shuttled freely to carry out efficient cargo handling and storage operations, which greatly improves the efficiency of warehousing operations.
The construction period is short
Steel structural components are mainly prefabricated in the factory and then transported to the site for assembly. This industrialized production method greatly shortens the construction period. Compared with the traditional concrete structure logistics warehousing construction, the steel structure logistics warehousing can be completed and put into use in a shorter time, which can quickly meet the urgent needs of logistics enterprises for storage facilities, so that enterprises can carry out business faster and seize market opportunities.
Cost control advantages
On the one hand, factory prefabricated production reduces the amount of on-site wet work and labor, and reduces the labor cost and management cost in the construction process. On the other hand, due to the short construction period, the project funds can be returned faster, reducing the cost of capital occupation. In addition, the steel structure has a long service life and low maintenance costs, which saves a lot of operating expenses for enterprises in the long run.
Adaptable
As the logistics business continues to evolve and change, so does the need for warehousing space and functionality. Steel structure logistics warehousing has good flexibility and scalability, and is easy to transform and expand. According to business needs, it is convenient to increase or decrease functional areas, and adjust the internal layout, such as adding offices, sorting areas, etc., to meet the requirements of logistics operations in different periods.
Why Choose Us:
Professionally customized
A team of professional and experienced designers uses advanced techniques to customize exclusive solutions, repeatedly polish details, and meet the needs of various complex projects.
Strict quality control, worry-free warranty
Strict control of raw materials, selection of high-quality steel, the use of automation equipment fine processing, each process follows industry standards, professional packaging and delivery, to provide worry-free warranty.
Outstanding performance and full range of advantages
The product is lightweight, high strength, and has good seismic performance, which can reduce the weight and foundation cost of the building, ensure stability and safety, shorten the construction period and improve productivity.
One-stop construction, efficient delivery
Provide one-stop construction services, coordinate all links, adopt rapid assembly methods, reduce construction time, and experienced teams ensure that the project is completed on time and with high quality, efficient and convenient delivery.
Choosing our steel structure building products is to choose professionalism, quality, efficiency and value. We look forward to working with you to create excellent construction projects!
♥♥ Hi dear friends, please note
Steel structure building is a product that can be designed according to the different needs of each pillar.
So, if you find that the following example pictures are not the same as your needs, or even very different.
Do not worry
No matter what kind of building you need,Bigger, smaller or multi-storey, just tell me the building data or drawings you need.
We will make accurate designs, quotations and renderings for you as soon as possible.
(Our group has more than 10 years of experience in steel structure)
Looking Forward To Your Inquiry!
Company Profile
Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications


