Product Description
Steel frame prefabricated steel structure gymnasium/basketball court gymnasium building
With the characteristics of high strength and good toughness of steel, the steel structure stadium creates an open and column-free large space, which can not only meet the needs of football, track and field and other sports events, but also host large-scale concerts. The specially treated steel is corrosion-resistant and anti-aging, reducing long-term operating costs and extending the life of the stadium. In addition, steel can be recycled, which not only reduces construction waste, but also reduces energy consumption in the transportation and construction process, which is in line with the concept of green environmental protection, and has become an important infrastructure to meet the needs of national fitness and cultural and sports activities from bustling cities to remote areas.
Buiiding Name |
Steel structure stadium |
Main Frame |
Main Beam |
Hot Rolled H Beam, Buildup H Beam,Q235B/Q355B Grade Steel |
Secondary Beam |
Main Column |
Wind-resistance Column |
Secondary Frame |
Tie Bar |
Round Pipe |
Bracing |
Steel Angle Bar/Round Bar,X-bracing |
Purline |
C/Z Section Pre-galvanized Steel |
Hanger Rod |
12mm Galvanized Round Bar |
Knee Brace |
50x5EA |
Roof and Wall System |
Roof Panel |
Single Corrugated Steel Sheeting,PU Sandwich Panel,Glass Wool Sandwich Panel,EPC |
Wall Panel |
Skylight Panel |
2mm Thickness FPR |
Window |
PVC/Plastic Steel/Aluminum Window |
Door |
Electric/Hand Roller Door/Walk Door etc |
Gutter |
Galvanized/Stainless Steel Gutter |
Downpipe |
PVC/Aluminum Downpipe |
Ventilating System |
Exhaust Fan etc |
Bolts |
Anchor Bolts,High Strength Bolts,Normal Bolts |
Product Advantages:
Steel has excellent strength and toughness, which makes the steel structure stadium fully advantageous in terms of space creation. Compared with traditional building materials, steel has a higher yield strength, which can carry huge weight with a small cross-sectional size when building long-span structures, effectively reducing the number of internal columns. For example, a steel structure stadium the size of a standard football field, with the help of steel characteristics, can create an open and unobstructed viewing space, accommodate tens of thousands of spectators, and at the same time meet the space needs of track and field events, large-scale concerts and other diversified activities, and comprehensively improve the functionality and practicality of the venue.
The steel is treated by a special process, which has excellent performance in corrosion resistance and aging resistance, which greatly extends the service life of the steel structure stadium. In the case of a stadium in a seaside city, even if it is subjected to long-term erosion by sea breeze and salt spray, the protective coating on the surface of the steel and its own stable chemical properties can prevent corrosion and ensure the stability of the structure. In addition, the maintenance cost of steel is much lower than that of concrete and other materials, which effectively reduces the comprehensive cost of the stadium from the perspective of long-term operation, and achieves a win-win situation of economic benefits and efficiency.
Steel is a recyclable material, which gives the steel stadium significant environmental benefits. When the stadium is facing demolition or renovation, the vast majority of the steel can be recycled and reused for new construction projects, reducing the generation of construction waste. According to statistics, after the demolition of a medium-sized steel structure stadium, the steel recycling rate can reach more than 90%. At the same time, the lightweight design of steel reduces energy consumption in the transportation and construction process, which is in line with the current development concept of green buildings.
Why choose us:
Time is of the essence when moving a project forward. Our company has a mature prefabricated production system, and the steel structural components are processed in the factory, which greatly reduces the on-site operation time. With a number of experienced and skilled construction teams, the average construction speed is 30% faster than that of the industry. In the past, we have delivered a number of large-scale stadiums and industrial plant projects ahead of schedule, so that customers can put them into operation as soon as possible and seize market opportunities.
We regard technology as the core driving force of enterprise development, and have set up a technology research and development team led by a number of senior industry experts to continuously overcome technical problems. In the field of design and construction of large-span space structures, we have obtained a number of patents. The company has also introduced BIM technology to conduct whole-process simulation analysis from project design, construction to post-maintenance, to achieve precise control, reduce construction errors, ensure that the quality of the project is always at the leading level in the industry, and create steel structure buildings that can stand the test of time for customers.
The company has built a mature logistics and distribution system, with a professional transportation team and modern transportation equipment to ensure that the steel is delivered to the project site in a timely and safe manner. In the process of transportation, develop a reasonable transportation route. For large projects or urgent orders, open up green channels and prioritize transportation. At the same time, we provide customers with one-stop transportation services, including cargo loading and unloading, on-site stacking, etc., to save customers' time and energy to the greatest extent and ensure the orderly progress of project construction.
Factory show
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
Installation drawings: we will supply the detailed installation drawings and video to show how to install the products. Even send the engineers to site for installation help.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

Packaging & Shipping

Certifications

FAQ
