Customization: | Available |
---|---|
After-sales Service: | After-Sales Service Guarantee |
Feature: | Durable, Easy to Assemble, Movable |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel structure office building | |
Project Name | Steel structure school |
After-sale Service | Online technical support |
Place of Origin | China |
Primary Framing | H column and beam |
Secondary Framing | Z and C sections purlin |
Roof and Wall panels | steel sheet and insulated sandwich panels |
Steel Decking Floor | Decking board |
Mezzanines, Platforms | H beam |
Other Building Accessories | Sliding Doors, Roll Up Doors, Windows, Louvers, etc. |
Customized design is welcomed. | |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
What can we offer you?
Chentai Steel Structure Co., Ltd. was established more than 15 years, we have established a complete production system management, the factory covers about 106,5 60 square meters, including 80+ engineers. We can provide the following services:
1. Blueprint design, customized for you according to customer requirements and the situation of the construction site.
2. Mass production capacity of steel structure prefabrication.
3. Products are delivered on time.
4. Detailed installation manuals and videos are available.
5. Online engineer guidance
Large-span space application: The school's gymnasium, performance hall and other places often use long-span steel structure design. For example, the newly built gymnasium of a well-known middle school in China, with a span of more than 50 meters and no columns inside, is spacious and open, which can accommodate the assembly of teachers and students of the whole school and hold large-scale sports events at the same time, and the space utilization is efficient and flexible.
Flexible transformation: With the update of educational concepts and the diversification of courses, the needs of classroom layout are changeable. The steel structure building is easy to dismantle and reinstall the partition wall, and the ordinary classroom can be quickly transformed into a laboratory, art creation room, etc., to adapt to the teaching of different disciplines and meet the long-term development needs of the school.
Factory prefabrication: The steel is cut, processed and welded into components according to precise dimensions in modern factories, and the quality is controllable. The factory environment is stable to avoid the accumulation of on-site construction errors, such as the production of steel beams, automation equipment to ensure that the beam length and cross-sectional size deviation are controlled at the millimeter level.
On-site assembly: After the prefabricated components are transported to the construction site, the crane cooperates with the workers to assemble them quickly. Compared with the traditional brick and concrete school, the construction period is greatly shortened. For a small steel structure school, the main construction took only 3 months, while the same scale brick and concrete school took 6-8 months, which greatly advanced the delivery time.