Roof |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Wall |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Doors |
Steel rolling shutter or others |
Windows |
Alu. Alloy window,or others |
Edge Cover |
Steel sheet 0.5mm thickness |
Bolts |
M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc |
Light Steel Structure Prefabricated House Villa Construction Building
1. High structural stability
2. Commercial process
3. Fast building
4. Construction with little influence of climates
5. Personalized housing inside design
6. 92% useable floor area
7. Diverse appearance
8. Comfortable and energy saving
9. Have good sound and heat insulation system
10. High repeating utilization factor of stuf
Main Steel Structure:
A.The Main steel structure: Q355B Q345B Q235B H column Beam B.Secondary Steel Structure: Q355B Q345B Q235B Square tube/ angle iron / circular tube etc
C.Purlin: Hot dipped galvanized C Z shape purlin
D.Floor decking: Hot dipped galvanized 688 / 750 type decking sheet
Company Profile
product features
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications
Team
FAQ
Q: Are you a trading company or a manufacturer?
A: We have our own steel structure manufacturing factory. Welcome to our company to view our products and discuss your project.
Q: Can you provide on-site installation service?
A: We can provide installation guidance service according to customer's requirements. Construction drawings, installation drawings and videos will be sent to the customer to help with on-site installation. If necessary, our engineers will go to the site to guide the installation.
Q.What's the delivery time?
A: It depends on the quantity of the order. Generally, the delivery time will be within 25 to 60 days.
Q.How can I get a quote for my project?
A: Please feel free to message me or email me here. I'll get back to you as soon as I can. Feel free to contact me for your construction services!