Product Description

Multi-storey Factory Supply Prefabricated Fabrication Steel Structure Frame Building Construction
We have established long-term strategic cooperation with large suppliers of high-quality raw materials, purchased directly from the source, effectively reduced the cost of intermediate links, and obtained high-quality materials at a very competitive cost.
The materials used in the steel structure workshop mainly include H-shaped steel, C-shaped steel, and Z-shaped steel, and the roof and wall covering materials are made of high-strength corrugated color steel plates and sandwich panels with excellent thermal insulation and thermal insulation properties.
Exterior wall panels and interior partition panels can be selected in a variety of ways, including corrugated sandwich panels with good sound insulation and thermal insulation effects, or sturdy and beautiful colored corrugated steel panels, which can fully meet the needs of different customers for building function and appearance.
The steel structure frame has excellent seismic performance and can effectively resist natural disasters such as earthquakes; In the whole process of construction and use, there is no pollution emission, in line with the concept of environmental protection; At the same time, the heat conduction efficiency of steel is low, which plays a good role in energy saving, and the construction process strictly follows the safety specifications to ensure the safety of construction.
The overall weight of the steel structure building is light, which greatly reduces the bearing pressure of the foundation; The components have a high degree of standardization, the installation process is simple and fast, which can significantly shorten the construction period, allow investors to quickly achieve a return on investment, and after the building is demolished, the steel can be recycled and reused, and the advantages of green environmental protection are outstanding.
We have set up an independent and professional quality control department, from raw material procurement and inspection, component processing and production supervision, to construction site installation quality control, every link is strictly supervised, to ensure the high-quality delivery of the project.
Name |
Steel structure multi-storey building |
Dimensions |
Length |
H beam: 4000-15000mm |
Thickness: |
web plate: 6-32mm |
wing plate: 6-40mm |
Height |
200-1200mm |
Color |
According to customers |
Size |
MOQ is 200 m2, width * length * eave height, |
Advantages |
1. Lower cost but beautiful outlook. |
2. High safety performance. |
3. easy to assemble and dismantle |
4. manufacture under complete quality control system---ISO9001 |
5. installation with instruction of experienced engineers |
6. Non-pollution. |
Main components |
Base |
Cement and steel foundation bolts |
Main frame |
H beam |
Material |
Q235B, Q345B or others as buyers' requests. |
Purlin |
C or Z purlin: Size from C120~C320, Z100~Z20 |
Bracing |
X-type or other type bracing made from angle, round pipe |
Bolt |
Plain bolt and High-strenth bolt |
Roof & wall |
Sandwich panel or color plate |
Door |
Sliding or rolling door |
Window |
Aluminium alloy window |
Surface |
Two lays of Anti-rust Painting or Hot Dip Galvanized |
Sheet |
0.5mm or 0.6mm galvanized sheet |
Accessories |
Semi-transparent skylight belts, Ventilators,down pipe, Glavanized gutter, etc |
Foundation construction stage: firstly, the site leveling and measurement are carried out according to the design drawings, and the position and foundation contour of the building are accurately determined. Then the earthwork excavation work is carried out, and after excavation to the design elevation, the foundation is compacted to ensure the bearing capacity of the foundation. Immediately after carrying out steel bar binding and template support, the made steel bar is tied into a foundation skeleton according to the design requirements, the template is installed to form a pouring space, and then the concrete is poured, and the foundation reaches the design strength after vibrating, maintenance and other processes, so that the foundation reaches the design strength and builds a solid foundation for the superstructure.
Steel structure installation stage: After the foundation strength reaches the standard, the installation of the steel structure begins. First, the steel column is hoisted to the foundation position, and the anchor bolts are preliminarily fixed, and then the verticality and elevation of the steel column are accurately adjusted by measuring instruments to ensure the installation accuracy. After the steel column is installed, the steel beam is installed in turn, and the steel beam and the steel column are firmly connected by high-strength bolts or welding to form a stable frame structure. During the installation process, the deformation and verticality of the structure should be monitored in real time, and adjustments should be made in time to ensure the stability and accuracy of the entire steel structure frame.
Maintenance structure and decoration construction stage: After the installation of the main body of the steel structure is completed, the construction of the maintenance structure will begin. Installation of exterior wall panels and roof panels, these panels usually have a variety of functions such as thermal insulation, heat insulation, waterproofing, etc., and it is necessary to pay attention to the splicing and sealing treatment of the panels during installation to prevent leakage and other problems. At the same time, the construction of the internal partition wall was carried out to divide the different functional spaces. Finally, the decoration work is carried out, including the treatment of walls and floors, the installation of doors and windows, the installation and commissioning of electrical and water supply and drainage systems, etc., so that the building can meet the use standards and present a beautiful and comfortable space environment.
Product Advantages:
Significant cost advantages: Through long-term strategic cooperation with large suppliers of high-quality raw materials, we purchase materials directly from the source, effectively reducing the cost of intermediate links. This makes the steel structure multi-storey building very competitive in terms of material cost, and can obtain high-quality materials with lower investment, saving investors a lot of money and improving the economic benefits of the project.
Excellent material performance: The H-shaped steel, C-shaped steel, Z-shaped steel, etc. used in the steel structure workshop have the characteristics of high strength and good toughness, providing a stable supporting structure for the building. The high-strength corrugated color steel plate covered by the roof and wall and the sandwich panel with excellent thermal insulation performance not only ensure the waterproof and thermal insulation effect of the building, but also improve the overall aesthetics of the building and meet the diverse needs of different customers for building function and appearance.
Efficient and fast construction: the overall weight of the steel structure building is light, which greatly reduces the bearing pressure of the foundation and makes the foundation construction more convenient. The components have a high degree of standardization, and the installation process is simple and fast, which can significantly shorten the construction period. This not only allows investors to quickly realize the return on investment, but also reduces the time cost and management cost in the construction process, and improves the overall efficiency of the project.
Versatile and flexible: exterior wall panels and interior partition panels are available, corrugated sandwich panels have good sound insulation and thermal insulation effects, and colored corrugated steel panels are durable, beautiful and generous. This diversified choice enables the steel structure multi-storey building to flexibly adapt to different use scenarios, whether it is industrial production, commercial office or residential needs, it can be easily met, creating a comfortable and efficient space environment for users.
Our advantages:
Design scheme: The company has a professional design team, which can use advanced design software to accurately design according to the different needs of customers and building functions, combined with the geological conditions, climate and environment of the project location. Provide a variety of design solutions for customers to choose from, pay attention to detail optimization, and ensure that the steel structure building achieves the best balance in terms of safety, stability, practicality and aesthetics. At the same time, the design team will maintain close communication with customers, and adjust and improve the design scheme in a timely manner according to customer feedback to meet the individual needs of customers.
Steel quality: The company strictly controls the quality of steel, and establishes long-term cooperative relations with well-known steel suppliers at home and abroad to ensure that the purchased steel products meet national standards and industry norms. Before entering the construction site, each batch of steel must undergo strict inspection and testing, including chemical composition analysis, mechanical property testing, appearance quality inspection, etc., to prevent unqualified steel from entering the project. The company has also established a complete steel quality traceability system, which can accurately trace the source and use of each batch of steel, providing a reliable guarantee for the quality of the project.
Transportation: The company has a professional transportation team and supporting transportation equipment, which can formulate a reasonable transportation plan according to the size, weight and transportation distance of steel structural components. In the process of transportation, scientific packaging and fixing methods are adopted to ensure that the components are not damaged during transportation. At the same time, the company has established cooperative relations with a number of logistics companies, which can timely and accurately transport the steel structure components to the construction site according to the project schedule requirements, and is responsible for the unloading and stacking of the site, providing strong support for the smooth construction of the project.
Company Profile

China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading:We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
Installation drawings: we will supply the detailed installation drawings and video to show how to install the products. Even send the engineers to site for installation help.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
Packaging & Shipping

1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications

FAQ

Welcome to contact us!
We look forward to hearing from you regarding any business inquiries.