Product Description
Custom design
We have a professional design team with 20 years of experience to meet your individual needs, and the colors of steel components, roofs and wall panels can be customized.
Extremely fast delivery
Intelligent modern factory, 300,000 hectares of production area, delivery within 3-5 weeks.
Production visualization
Provide pictures and videos of all links from raw material procurement to steel processing, and also support video connection to the workshop, the whole process is transparent.
Packing and delivery
Packed in containers and pallets to protect the surface of the steel structure, mark the components according to the drawings for easy installation.
Installation instructions
Provide installation instructions and videos, and send engineers to the site to guide the construction personnel to carry out the project construction.
Steel structure office building |
Project Name |
Steel structure school |
After-sale Service |
Online technical support |
Place of Origin |
China |
Primary Framing |
H column and beam |
Secondary Framing |
Z and C sections purlin |
Roof and Wall panels |
steel sheet and insulated sandwich panels |
Steel Decking Floor |
Decking board |
Mezzanines, Platforms |
H beam |
Other Building Accessories |
Sliding Doors, Roll Up Doors, Windows, Louvers, etc. |
Customized design is welcomed. |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
Packaging & Delivery:
Package Size |
100.00cm * 80.00cm * 60.00cm |
Package Gross Weight |
100.000kg |
Product Advantages:
Light weight and high strength: The yield strength of the high-strength steel selected is much higher than that of traditional building materials, which greatly reduces the weight of the building while ensuring stable support. For example, compared with brick-concrete structures, the weight of steel structure office buildings can be reduced by about 30%-50%, which not only reduces the construction difficulty and cost of foundation engineering, but also effectively improves the stability of buildings in natural disasters such as earthquakes, and reduces the risk of structural damage.
In strict accordance with the ISO 9001:2008 international quality management system standard, every link is carefully controlled from raw material procurement, component processing and production to on-site installation and commissioning. The certification of professional authorities means that the steel structure office building has reached the world-class level in terms of quality control, production technology, service level, etc., providing users with solid quality assurance, whether it is for self-use or external leasing, it can demonstrate high-end quality and reliable image.
Shortened construction period: The industrial construction mode of prefabricated components and on-site rapid assembly is adopted, which greatly reduces the wet operation and cross operation on the construction site. Compared with traditional building construction methods, the construction period of steel structure office buildings can be shortened by 20%-30%.
Material saving: Optimized structural design, accurate calculation of steel consumption, and reduction of unnecessary material waste. At the same time, the high strength of the steel allows for the use of components with smaller cross-sectional dimensions, reducing the overall use of steel and further cost savings.
Our advantages:
Design Advantages
The company's design team is composed of senior designers, who communicate and understand the customer's needs for the function, space and style of the office building, and with the help of advanced software and cutting-edge concepts, create a customized solution that takes into account aesthetics and mechanical safety, and lay a solid foundation for the construction.
Quality advantage
Build a strict quality assurance system, from the procurement of high-quality steel to the use of advanced equipment in production and processing to test the accuracy, flatness and welding quality of components, the whole process is supervised by experienced personnel, and there are professionals on site to control the installation, and strive to create high-quality projects.
Shipping advantages
The professional logistics team cooperates with the perfect transportation network, formulates the optimal transportation plan according to the project location and schedule, transports large components with special vehicles, tracks the transportation status in real time through the logistics management system, communicates in advance to ensure accurate delivery, and helps the project to advance.
Company Profile

China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 21 years. The factory covers an area of 30 hectares.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading:We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!


Packaging & Shipping

1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications

FAQ
Q: Are you a factory or trading company?
A: We are a manufacturing factory, we can provide one-stop service for customers. You can get the best service and competitive prices.
Q: How can I get a quote for a project?
A: You can contact us via email, phone, Trade Messenger, WhatsApp, Skype, Viber, etc., and we will get back to you as soon as possible.
Q: Do you accept container loading inspections?
A: You are welcome to send inspectors to visit the factory, not only at the time of loading, but also at any time. If it's not convenient, we also provide real-time video display.
Q: Do you provide design services?
A: Yes, we can design complete solution drawings according to your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.
Q: What's the payment terms?
A: Payment terms: T/T, L/C, other payment methods can be negotiable
Q: What's the delivery time?
A: The delivery time depends on the order quantity.