High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

Product Details
Customization: Available
After-sales Service: After-Sales Service Guarantee
Feature: Durable, Easy to Assemble, Movable
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

R&D Capabilities
The supplier has 28 R&D engineers, you can check the Audit Report for more information
Quality Assurance
The supplier provides quality assurance
In-stock Capacity
The supplier has In-stock capacity
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (22)
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
  • High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
office 96601
Material
Steel Structure
Intensity
High Intensity
Weight
Light Weight
Stiffness
The Overall Stiffness Is Good
Deformation
Strong Resistance to Deformation
Homogeneity
The Material Has Good Homogeneity
Apply
Easy to Apply
Toughness
Good Toughness
Industrialization
High Degree of Industrialization
Period
The Constrution Period Is Short
Reliability
High Structural Reliability
Design
Customized
Manufacture
Customized
Delivery
Customized
Type
H-Section Steel
Waterproof
Highly
Transport Package
Strapping and Packing
Specification
20-28 Square Meters
Trademark
Shandong Qianfeng Chentai Steel Structure
Origin
China
HS Code
730890
Production Capacity
200, 000 Tons / Year

Packaging & Delivery

Package Size
1100.00cm * 200.00cm * 200.00cm
Package Gross Weight
22000.000kg

Product Description

 
Product Description
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
A famous case of steel structure office building

1 Breham, London: designed by Wilkinoneyre Architects, with structural design by Arup Engineering Consultants. The building offers 19 floors, 27,700 square meters of office space, with a column grid of 9m center spacing, and a maximum internal span of 13.7m.

Chicago 800 Fulton: Designed by SOM, this 19-story mixed-use office building. Its exterior steel support frames on the east and west facades resist wind loads, and a unique structural system allows for large open floors and flexible, light-filled workspaces.

Robinson 18 Office Tower, Singapore: Designed by Kohnpedersenfoxassociates and architects61. A landmark building in Singapore, the building offers public green space comparable to the size of the site, with landscaped podiums and rooftop sky gardens featuring planted trees, natural ventilation and city views.

China Shenzhen Free Trade Times Center Project: Located in the Qianhai Free Trade Zone of Shenzhen, it adopts the construction of steel frame + core tube system, with a total construction area of about 500,000 square meters, including 2 super high-rise comprehensive office buildings.

 
Steel structure office building
Project Name Steel structure school 
After-sale Service Online technical support
Place of Origin China
Primary Framing H column and beam
Secondary Framing Z and C sections purlin
Roof and Wall panels steel sheet and insulated sandwich panels
Steel Decking Floor Decking board
Mezzanines, Platforms H beam
Other Building Accessories Sliding Doors, Roll Up Doors, Windows, Louvers, etc.
Customized design is welcomed.
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly.

High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure         

High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

Large-span space application: The school's gymnasium, performance hall and other places often use long-span steel structure design. For example, the newly built gymnasium of a well-known middle school in China, with a span of more than 50 meters and no columns inside, is spacious and open, which can accommodate the assembly of teachers and students of the whole school and hold large-scale sports events at the same time, and the space utilization is efficient and flexible.

Flexible transformation: With the update of educational concepts and the diversification of courses, the needs of classroom layout are changeable. The steel structure building is easy to dismantle and reinstall the partition wall, and the ordinary classroom can be quickly transformed into a laboratory, art creation room, etc., to adapt to the teaching of different disciplines and meet the long-term development needs of the school.

Factory prefabrication: The steel is cut, processed and welded into components according to precise dimensions in modern factories, and the quality is controllable. The factory environment is stable to avoid the accumulation of on-site construction errors, such as the production of steel beams, automation equipment to ensure that the beam length and cross-sectional size deviation are controlled at the millimeter level.

On-site assembly: After the prefabricated components are transported to the construction site, the crane cooperates with the workers to assemble them quickly. Compared with the traditional brick and concrete school, the construction period is greatly shortened. For a small steel structure school, the main construction took only 3 months, while the same scale brick and concrete school took 6-8 months, which greatly advanced the delivery time.

Short-term investment: Although the purchase price of steel is higher than that of ordinary building materials, the funds are quickly withdrawn considering the labor and equipment rental costs saved by the fast construction, as well as the income from early enrollment and running schools. Taking private boarding schools as an example, the tuition income brought by the early operation of one semester is enough to make up for the high investment in steel structure materials in the early stage.

Long-term maintenance: The durability of the steel structure is more than 50 years, and the daily maintenance is focused on regularly checking the anti-corrosion coating and fastening the connectors. The annual maintenance cost is only 10-20 yuan per square meter, which is far lower than the cost of frequent repair and reinforcement of traditional brick-concrete structures in the later stage, reducing the burden on the long-term stable operation of the school.
  
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

 

Our advantages:

★Strong production and processing capacity State-of-the-art equipment ensures efficient production The steel structure processing plant is equipped with a series of advanced production and processing equipment, which is the key to ensuring efficient production. For example, the large-scale CNC cutting machine can accurately cut steel plates of various specifications according to preset programs, and its cutting accuracy can reach ±0.5mm, which greatly improves the utilization rate of steel and reduces material waste. The automatic welding equipment adopts advanced welding technology and control system, which can achieve high-speed, stable and high-quality welding operations. The welding speed of automatic welding equipment is several times higher than that of manual welding, which can greatly shorten the production cycle and improve production efficiency.

The professional design team provides customized solutions The steel structure processing plant has a professional design team composed of senior designers, who have rich experience and deep expertise in the field of steel structure design. The team members cover structural design, architectural design, mechanical design and other professional fields, and can provide customers with comprehensive and professional steel structure design services from different perspectives.

Improve the quality control system to ensure the whole process of monitoring The steel structure processing plant has established a complete quality control system, which covers the whole process from raw material procurement to product delivery, ensuring strict monitoring and management of every link.


 Hello, dear friends, welcome to Qianfeng Chentai Steel Structure Company. We have been in the field of steel structure for more than 15 years. In these 15 years, we have concentrated on the professional processing of steel structures, and we are concerned about the design and manufacture of steel structure buildings. In this way, our designs become more professional and economical, and our manufacturing becomes higher quality and more cost-effective. What's more, to provide the best service at all times. We will always get back to you and give you the best advice when you need it. We cherish every opportunity to work with you. Now we are expanding the overseas market. So our price is more competitive than others. 
 
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
 
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

Company Profile
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure
Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.

Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.

 
 
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.

Container loading:We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

 


"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
 

High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel StructureHigh Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

Packaging & Shipping

High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure


1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box


 
Certifications

High Quality Super High-Rise Office Building Hotel Financial Building Multi-Purpose Steel Structure

 

FAQ


Q: Are you a factory or trading company?
A: We are a manufacturing factory, we can provide one-stop service for customers. You can get the best service and competitive prices.

Q: How can I get a quote for a project?
A: You can contact us via email, phone, Trade Messenger, WhatsApp, Skype, Viber, etc., and we will get back to you as soon as possible.

Q: Do you accept container loading inspections?
A: You are welcome to send inspectors to visit the factory, not only at the time of loading, but also at any time. If it's not convenient, we also provide real-time video display.

Q: Do you provide design services?
A: Yes, we can design complete solution drawings according to your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: What's the payment terms?
A: Payment terms: T/T, L/C, other payment methods can be negotiable

Q: What's the delivery time?
A: The delivery time depends on the order quantity.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now