Product Description
Prefabricated metal light steel structure custom building factory portal steel frame processing workshop
The steel structure factory is a kind of industrial plant built with steel structure, which has the advantages of sturdiness and durability, high space utilization, and fast construction speed. Its main structure is composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plates, etc., which are assembled by welding, bolt connection and other means. The interior space is open, flexible layout according to production needs, can adapt to various industrial production processes, and is widely used in machinery manufacturing, automobile production, warehousing and logistics and many other industries.
Product name |
Steel Structure Factory |
Length |
H beam 4000-15000mm |
Height |
200-1200mm |
Galvanizing Thickness |
40 - 100 μm, etc. for Selection. |
Main frame |
H beam |
Base |
Cement and steel fouddation bolts |
Specification |
Custom |
Bolt |
Plain bolt ang high-strenth bolt |
Roof&wall |
Sandwich panel or color plate |
Door |
Sliding or rolling door |
Transport Package |
Seaworthy Package |
Trademark |
CT Steel Structure |
Customized design is welcomed. |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
Preliminary preparation: complete the feasibility study of the project, the approval of the design plan, etc., and apply for the relevant construction permits. Carry out site leveling to ensure that the construction site has construction conditions, and at the same time connect water and electricity, build temporary facilities, and provide living and office space for construction personnel.
Foundation construction: According to the design requirements, the foundation is excavated, the concrete foundation is poured, and the anchor bolts and other connectors are embedded in the foundation to provide stable support for the installation of the steel structure. After the foundation construction is completed, it needs to be maintained, and the next step of construction can be carried out only after the design strength is reached.
Steel structure production: according to the design drawings in the factory for the processing and production of steel structure components, including steel cutting, welding, correction, drilling and other processes. After the production is completed, the components are derusted and anti-corrosion, and protective coatings such as anti-rust paint are painted.
Steel structure installation: transport the made steel structure components to the construction site, and use cranes and other equipment to lift them in place. The steel columns are installed first, their verticality and elevation are adjusted, and then the steel beams are installed, and the beams and columns are connected into an integral frame structure by bolting or welding. Then install secondary components such as purlins and supports to enhance the stability of the structure.
Maintenance system installation: Install maintenance plates for roof and wall on the steel structure frame, such as color steel plates, sandwich panels, etc. At the same time, auxiliary facilities such as doors and windows, gutters, and downspouts are installed to form a complete building maintenance system.
Installation of internal facilities: According to the use function of the factory, the installation and commissioning of internal equipment, such as ventilation system, lighting system, fire protection system, power system, etc. At the same time, ground treatment is carried out, such as pouring concrete floors, laying epoxy floors, etc.
Completion acceptance: After the completion of the above construction content, organize relevant departments and personnel to carry out completion acceptance, inspect and test the quality, safety and operation of various facilities of the steel structure, and ensure that the steel structure factory meets the design requirements and relevant specifications and standards, and can be put into normal use.
Why Choose Us:
The company brings together the industry's top technical talents, with advanced design software and rich project experience, to create accurate and personalized steel structure solutions for customers. From the preliminary site investigation to the comprehensive consideration of the building's function, aesthetic style and structural safety during the design process, every link is perfect. In the design of long-span venues, we use 3D modeling technology to simulate structural forces and optimize the design scheme to ensure that the building meets the needs of use and maximizes cost-effectiveness. At the same time, we keep up with industry trends and introduce an intelligent monitoring system to collect building structure data in real time to escort project operations.
We have set up a construction team with excellent professional quality and rich experience, from raw material procurement to on-site installation, strictly follow the standardized operation process to ensure the construction progress and quality. In the steel structure processing link, advanced automation equipment is used to realize high-precision cutting and welding of components, which greatly shortens the processing cycle. The construction site is equipped with professional hoisting equipment and technical personnel to scientifically plan the construction process to ensure the safety and efficiency of the installation process. We have also established a strict quality control system to conduct all-round testing of each link, eliminate potential quality hazards, and make every effort to create high-quality projects.
We have set up a professional transportation team to strictly control the transportation link to ensure that the steel structural components are delivered on time and safely. The company is equipped with advanced transportation equipment, according to the size and weight of the components, customize the exclusive transportation plan, and use special shelves and lashing tools to fix the components in an all-round way to prevent collision and displacement during transportation. We have built a complete transportation management system, through real-time tracking of transport vehicles, plan the optimal route in advance, and respond to traffic congestion and other emergencies in a timely manner. Reduce transportation risks in an all-round way and lay the foundation for the smooth progress of the project.

Company Profile
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
Installation drawings: we will supply the detailed installation drawings and video to show how to install the products. Even send the engineers to site for installation help.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box