Product Description
Prefabricated long-span quick-install modular panel footbridge
The entire bridge is welded from high-strength steel. The main beam is a lightweight composite panel, and the panel is connected by a panel connecting pin. Conversion between parts is easy, and they are very lightweight. Easy to assemble or disassemble and transport. It can also be assembled into different forms of slab bridges according to its span length and transportation requirements. Therefore, as a more developed and safe emergency transport bridge, it has been widely used.
Because the bridge floor is thin and the beam is light, it is suitable for occasions where the bridge span or load is small.
Product Name |
Large-span steel structure bridge |
Height |
10-200 M |
Wind Speed |
120KM/H |
Wind Load |
33kV-330kV |
High Strength Bolt |
M20,10.9S |
Top brace |
SHS150*8 |
Steel beam |
HW400*408*21*21 |
Steel Structure Building Benefits
1. Low maintenance costs
2. Environmentally friendly and recycling.
3. Steel structure construction is strong, durable, and stable.
4. Steel components are resistant to termites and other destructive insects.
5. The service life of steel structure buildings is more than 50 years.
6. Fast construction, easy installation, and convenient to transport.
Steel Structure Building Applications
Livestock Shed, Garage, Plant, Warehouse, Workshop, Office Building, Hotel Building, Commercial Building, Residential House, Airplane Hangar, Outdoor Stadium Shed, Labour Camp, School, Exhibition Hall, Logistics Park, Refrigeration House, Resort, Dormitory Building, Shopping Mall.
Our Steel Structure Bridge advantage :
1. ISO and CE Certificate,SGS Certificated of Factory ;
2. 15 years steel structure production experience;
3. Professional steel structrue designer with engineer
4. Material: Q235B, Q355B;
5. Hot Dip galvanization;
6. High quality with reasonable price
8. Can produce various height and structural tower
Why Choose Us
Factory show
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
Port
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications
FAQ