Product Description
Modern Design Prefabricated Steel Structure Factory Workshop Building, Factory Price China
Gantry frame steel structure prefabricated industrial factory building construction / Industrial prefabricated workshop / Prefab office / factory metal shed
Steel structure building is a new form in building construction, which is composed of custom-designed structural steel components in an organized combination to meet the user's architectural and engineering requirements. Steel construction involves substructures or components in a building made of structural steel, connected and fixed by welding, bolts, and rivets.
Product name |
Steel Structure Factory |
Length |
H beam 4000-15000mm |
Height |
200-1200mm |
Galvanizing Thickness |
40 - 100 μm, etc. for Selection. |
Main frame |
H beam |
Base |
Cement and steel fouddation bolts |
Specification |
Custom |
Bolt |
Plain bolt ang high-strenth bolt |
Roof&wall |
Sandwich panel or color plate |
Door |
Sliding or rolling door |
Transport Package |
Seaworthy Package |
Trademark |
CT Steel Structure |
Customized design is welcomed. |
In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather.We will quote for you promptly. |
The construction of steel structure factory mainly covers key links such as preliminary preparation, foundation construction, main body installation and later protection. In the early stage of construction, it is necessary to accurately calculate and purchase high-quality steel in combination with the design requirements of the factory, and complete the site leveling, temporary facilities construction and deepening of construction drawings. In the foundation construction stage, according to the soil conditions and building load, the construction scheme of independent foundation and pile foundation is determined, and the position of the foundation is accurate through accurate measurement and pay-off, and the reinforcement is tied, the formwork is erected, and the concrete is poured.
When the main body is installed, a large crane is used to hoist each component in an orderly manner according to the order of first steel column and then steel beam. After the steel column is installed, the verticality correction needs to be carried out, and the steel beam is accurately connected with the steel column with the help of high-strength bolts or welding to form a stable frame system. In this process, total stations and other equipment are used to monitor the installation accuracy in real time. After the installation is completed, in order to prolong the service life of the steel structure, anti-corrosion and fireproof treatment are required.
Why Choose Us:
The company brings together the industry's top technical talents, with advanced design software and rich project experience, to create accurate and personalized steel structure solutions for customers. From the preliminary site investigation to the comprehensive consideration of the building's function, aesthetic style and structural safety during the design process, every link is perfect. In the design of long-span venues, we use 3D modeling technology to simulate structural forces and optimize the design scheme to ensure that the building meets the needs of use and maximizes cost-effectiveness. At the same time, we keep up with industry trends and introduce an intelligent monitoring system to collect building structure data in real time to escort project operations.
We have set up a construction team with excellent professional quality and rich experience, from raw material procurement to on-site installation, strictly follow the standardized operation process to ensure the construction progress and quality. In the steel structure processing link, advanced automation equipment is used to realize high-precision cutting and welding of components, which greatly shortens the processing cycle. The construction site is equipped with professional hoisting equipment and technical personnel to scientifically plan the construction process to ensure the safety and efficiency of the installation process. We have also established a strict quality control system to conduct all-round testing of each link, eliminate potential quality hazards, and make every effort to create high-quality projects.
We have set up a professional transportation team to strictly control the transportation link to ensure that the steel structural components are delivered on time and safely. The company is equipped with advanced transportation equipment, according to the size and weight of the components, customize the exclusive transportation plan, and use special shelves and lashing tools to fix the components in an all-round way to prevent collision and displacement during transportation. We have built a complete transportation management system, through real-time tracking of transport vehicles, plan the optimal route in advance, and respond to traffic congestion and other emergencies in a timely manner. Reduce transportation risks in an all-round way and lay the foundation for the smooth progress of the project.

Company Profile
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
Installation drawings: we will supply the detailed installation drawings and video to show how to install the products. Even send the engineers to site for installation help.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!

Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certifications